Pool remodeling should be done by a professional contractor since it is an important process. There are a number of reasons that may lead to remodeling of a pool, including upgrading the design to a newer one. There are other factors such as the deterioration of the structural integrity of the pool due to earthquakes, aging, lack of safety that make pool remodeling necessary. The entire remodeling process has numerous activities and steps to be undertaken. When one needs the best pool repair Gilbert offers the perfect location to visit.
The first step in the remodeling process is draining the pool since work cannot be done on it while it is still filled with water. It is therefore a must that water be pumped out. This is done using a submergible pump which is dropped in the structure in order to pump water out. The entire process may take a lot of time depending on the size of the pump being used and the size of the structure.
All the pieces of equipment that are linked to the pool have to be switched off during the process. After all water has been pumped out completely, the preparation phase begins. During this phase, all damaged surface material is removed completely. This process usually involves production of a lot of noise and dust. One is advised to remove any furniture placed on the patio. Plants, pots, and other items close to the pool must be removed too.
After the surface has been well prepared as desired, it is time for applying tiles, coping, and other materials meant to achieve decoration. The choice regarding the kind of types to be used is made by the client. Prior to doing masonry and tiling, production of a clear documentation of the condition of the pool and its environment is done. It is at this juncture that any design ideas that the client may desire are integrated into the remodeling project.
The application of tile and masonry is usually the more involving. It takes between one and three days depending on the number of workers the company sends over for the job. The size of the pool will also determine the length of time it takes. After this stage, it is time to apply sealant to ensure that plumbing is waterproof.
Upon completion of sealing, the material covering the surface of the pools is installed. At this point, the application of pool surface material is done. A number of finishing materials can be employed in this process. Such materials include hydrazzo, pebbles, quartz and beadcrete. Some of these materials are artificial while others are natural.
The finishing material selected may determine if the optional step of using acid to wash the surface is done or not. This process is part of cleaning, which then is followed by general cleaning of the entire structure and the surrounding areas. This is aimed at making sure that the surrounding area goes back to the same condition it was prior to the commencement of the project.
Once the cleaning process is complete, the contractor will fill the structure with water. The water is filled to the highest level possible. Usually, leakages are also tested as a standard practice. Surface curing and water treatment among other processes mark the conclusion of the project.
The first step in the remodeling process is draining the pool since work cannot be done on it while it is still filled with water. It is therefore a must that water be pumped out. This is done using a submergible pump which is dropped in the structure in order to pump water out. The entire process may take a lot of time depending on the size of the pump being used and the size of the structure.
All the pieces of equipment that are linked to the pool have to be switched off during the process. After all water has been pumped out completely, the preparation phase begins. During this phase, all damaged surface material is removed completely. This process usually involves production of a lot of noise and dust. One is advised to remove any furniture placed on the patio. Plants, pots, and other items close to the pool must be removed too.
After the surface has been well prepared as desired, it is time for applying tiles, coping, and other materials meant to achieve decoration. The choice regarding the kind of types to be used is made by the client. Prior to doing masonry and tiling, production of a clear documentation of the condition of the pool and its environment is done. It is at this juncture that any design ideas that the client may desire are integrated into the remodeling project.
The application of tile and masonry is usually the more involving. It takes between one and three days depending on the number of workers the company sends over for the job. The size of the pool will also determine the length of time it takes. After this stage, it is time to apply sealant to ensure that plumbing is waterproof.
Upon completion of sealing, the material covering the surface of the pools is installed. At this point, the application of pool surface material is done. A number of finishing materials can be employed in this process. Such materials include hydrazzo, pebbles, quartz and beadcrete. Some of these materials are artificial while others are natural.
The finishing material selected may determine if the optional step of using acid to wash the surface is done or not. This process is part of cleaning, which then is followed by general cleaning of the entire structure and the surrounding areas. This is aimed at making sure that the surrounding area goes back to the same condition it was prior to the commencement of the project.
Once the cleaning process is complete, the contractor will fill the structure with water. The water is filled to the highest level possible. Usually, leakages are also tested as a standard practice. Surface curing and water treatment among other processes mark the conclusion of the project.